Silver Wood

Aftabnagar, Dhaka

Completion Date

March 2024

Status Updated

October, 2022

SL. No Name of the work Progress details
01 Foundation work Piling work Completed. Foundation work Completed.
02 Super Structure work  4th FLOOR roof slab work completed.5th floor slab work on going.
03 Block Work 1st -2nd floor on going.
04 Electrical Conduit work
05 Door frame fitting work
06 Sanitary & plumbing line work
07 In side Plastering work
08 Electrical cable wiring work
09 Wall tiles work
10 Stair railing & Verandah Railing work
11 Outside plastering work
12 Floor tiles feting
13 L.C.C work
14 Window Grill work
15 Marbel  fitting work
16 Switch -Socket fitting work
17 Outside paint work
18 Door shutter work
19 Aluminum/Glazing work
20 Tiles Pointing work & Marble finishing work
21 Commode – Basin fitting work and C.P fittings work
22 Substation room work
23 Boundary wall /Ground floor development work
24 Roof top finishing work
25 Roof top Gardening work