Prime View

Uttara, Dhaka

Completion Date

May 2025

Status Updated

April, 2024

SL. No Name of the work Progress details
1 Foundation work 100% completed
2 Basement work N/A
3 Super Structure work 40% completed. (3rd floor roof slab casting completed)
4 Block Work
5 Electrical conduiting work
6 Door frame fitting work
7 Sanitary & plumbing line work
8 Inside Plastering work
9 Electrical cable wiring work
10 Wall tiles work
11 Common sanitary & Plumbing line work
12 Outside plastering work
13 Floor tiles/Marble work
14 L.C.C work
15 Grill & Railing work
16 Inside paint & Polishing work
17 Switch -Socket fitting work
18 Outside paint work
19 Door shutter work
20 Aluminum work
21 Tiles Pointing work & Marble finishing work
22 Commode – Basin fitting work and C.P fittings work
23 Lift/Generator /Substation /Solar work
24 Boundary wall /Ground floor development work
25 Roof top finishing work
26 Roof top Gardening work G.F Garden work
27 Land escape /Logo work