Moondrift Manor

North Khulshi, Chattogram

Completion Date

August 2026

Status Updated

April, 2024

SL.

No

Name of the work Progress details Remarks
01 Foundation work Piling Work is ongoing  
02 Super Structure work    
03 Brick Work    
04 Electrical work (Slab Conduit)    
05 Door frame fitting work    
06 Sanitary & plumbing line

work

   
07 In side Plastering work    
08 Electrical cable wiring work    
09 Wall tiles work    
10 Common sanitary &

Plumbing line work

   
11 Outside plastering work    
12 Floor tiles/Marble work    
13 L.C.C work    
14 Grill & Railing work    
15 Inside paint & Polishing work    
16 Switch -Socket fitting work    
17 Outside paint work    
18 Door shutter work    
19 Aluminum/Glazing work    
20 Tiles Pointing work & Marble

finishing work

   
21 Commode – Basin fitting work

and C.P fittings work

   
22 Lift/Generator /Substation

/Solar work

   
23 Boundary wall /Ground floor

development work

   
24 Land escape /Logo work    
25 Roof top finishing work    
26 Roof top Gardening work    
       