Jolie

Block A, Bashundhara R/A

Expected Completion Date

December 2027

Status Updated

October, 2025

SL. No Name of the work Progress details Remarks
1 Pile Work 100% Complete  
2 Sub Structure work Pile Cap & Grade Beam work is on process  
3 Block work    
4 Electrical  conduit work    
5 Door frame fitting work    
6 Sanitary & plumbing line  work    
7 In side Plastering work    
8 Electrical cable wiring work    
9 Wall tiles  work    
10 Common sanitary & Plumbing line work    
11 Outside plastering work    
12 Floor tiles/Marble work    
13 L.C.C work    
14 Grill & Railing work    
15 Inside paint & Polishing work    
16 Switch -Socket fitting work    
17 Outside paint work    
18 Door shutter work    
19 Aluminum/Glazing work    
20 Tiles Pointing work & Marble finishing work    
21 Commode – Basin fitting work and C.P fittings work    
22 Lift/Generator /Substation /Solar work    
23 Boundary wall /Ground floor development work    
24 Roof top finishing work    
25 Roof top Gardening work    

 