The Seasons

Block I, Bashundhara R/A

Expected Completion Date

To be Announced

Status Updated

October, 2025

SL. No Name of the work Progress details
  Pile Work 100% Completed
  Sheet Pile Work 100% Completed
  Foundation work 20% Completed
  Super Structure work 0% completed
  Block work 0% Complete
  Electrical  conduit work 0% Complete
  Door frame fitting work 0% Complete
  Sanitary & plumbing line  work 0%  Complete
  In side Plastering work 0% Complete
  Electrical cable wiring work 0% Complete
  Wall tiles  work 0% Complete
  Common sanitary & Plumbing line work 0% Complete
  Outside plastering work 0% Complete
  Floor tiles/Marble work 0% Complete
  L.C.C work 0% Complete
  Grill & Railing work 0% Complete
  Inside paint & Polishing work 0% Complete
  Switch -Socket fitting work 0% Complete
  Outside paint work 0% Complete
  Door shutter work 0% Complete
  Aluminum/Glazing work 0% Complete
  Tiles Pointing work & Marble finishing work 0% Complete
  Commode – Basin fitting work and C.P fittings work 0% Complete

 

 

 

  Lift/Generator /Substation /Solar work 0% Complete
  Boundary wall /Ground floor development work 0% Complete
  Roof top finishing work 0% Complete
  Roof top Gardening work 0% Complete