Expected Completion Date
April 2026
Status Updated
September, 2025
| SL. No | Name of the work | Progress details |
| 01 | Foundation work | Foundation Completed, |
| 02 | Super Structure work | 100% |
| 03 | Block Work | A2 = 100%, B2= 100%, A3 = 100%, B3= 100% ,A4= 100%, B4= 100% ,A5 = 100%, B5= 100% A6= 100%, B6= 100%, A7= 100%, B7= 100%, A8= 100%, B8= 100%, A9= 90%, B9= 90%, |
| 04 | Electrical conducting work | 85% |
| 05 | Door frame fitting work | A2 = 100%, B2= 100%, A3 = 100%, B3= 100% A4= 100%, B4= 100%, A5= 100%, B5= 100%, A6= 100%, B6= 100% ,A7= 100%, B7= 100%, A8= 100%, B8= 100% |
| 06 | Sanitary & plumbing line work | A2 = 30%, B2= 30%, A3 = 30%, B3= 30% ,B4= 30%, A4 = 30%, A5 = 30% ,B5= 30% |
| 07 | In side Plastering work | A2 = 100%, B2= 100%, A3 = 100%, B3= 100% ,A4= 100%, B4= 100% ,A5= 100%, B5= 90%, A6= 90%, B6= 90%, A7= 95%, B7= 95%, A8= 55%, B8= 55%, |
| 08 | Electrical cable wiring work | 20% |
| 09 | Wall tiles work | 25% |
| 10 | Common sanitary & Plumbing line work | N/A |
| 11 | Outside plastering work | 5% |
| 12 | Floor tiles/Marble work | N/A |
| 13 | L.C.C work | N/A |
| 14 | Grill & Railing work | N/A |
| 15 | Inside paint & Polishing work | N/A |
| 16 | Switch -Socket fitting work | N/A |
| 17 | Outside paint work | N/A |
| 18 | Door shutter work | N/A |
| 19 | Aluminum work | N/A |
| 20 | Tiles Pointing work & Marble finishing work | N/A |
| 21 | Commode – Basin fitting work and C.P fittings work | N/A |
| 22 | Lift/Generator /Substation /Solar work | N/A |
| 23 | Boundary wall /Ground floor development work | N/A |
| 24 | Roof top finishing work
|
20% |
| 25 | Roof top Gardening work G.F Garden work | N/A |