Expected Completion Date
April 2026
Status Updated
June, 2025
SL. No | Name of the work | Progress details |
01 | Foundation work | 100 % |
02 | Super Structure work | 98% |
03 | Block work | 85 % |
03 | Panel Work | 25 % |
05 | Electrical conducting work | 10 % |
06 | Door frame fitting work | N/A |
07 | Sanitary & plumbing line work | N/A |
08 | In side Plastering work | 55 % |
09 | Electrical cable wiring work | N/A |
10 | Wall tiles& floor tiles work | N/A
|
11 | Common sanitary & Plumbing line work | N/A |
12 | Outside plastering work | N/A |
13 | Floor tiles/Marble work | N/A |
14 | L.C.C work | N/A |
15 | Grill & Railing work | N/A |
16 | Inside paint & Polishing work | N/A |
17 | Switch -Socket fitting work | N/A |
18 | Outside paint work | N/A |
19 | Door shutter work | N/A |
20 | Aluminum/Glazing work | N/A |
21 | Tiles Pointing work & Marble finishing work | N/A |
22 | Commode – Basin fitting work and C.P fittings work | N/A |
23 | Lift/Generator /Substation /Solar work | N/A |
24 | Boundary wall /Ground floor development work | N/A |
25 | Roof top finishing work | N/A |
26 | Roof top Gardening work | N/A |
27 | Gardening work | N/A |
28 | Fair face finishing | N/A |
29 | Artificial fair face | N/A |
30 | Kitchen ver. Railing | N/A |
31 | Outside AC lover | N/A |
32 | Fir work | N/A |
33 | Swimming pool works | N/A |
34 | Pavement tiles | N/A |
35 | Pvc false ceiling works | N/A |