Completion Date
April 2026
Status Updated
March, 2024
SL. No | Name of the work | Progress details |
01 | Shore pile | 100% completed |
Tie beam | 100% completed | |
02 | Earth cutting | 100% Completed |
03 | Foundation Casting | 100% Completed |
03A | Sub-Structure Work | 50% Completed (Basement Column, R/W casting going on) |
04 | Supper structure | |
05 | Electrical conducting work |
|
06 | Door frame fitting work | |
07 | Sanitary & plumbing line work (Ace drain water line, ver- vertical line) | |
08 | In side Plastering work | |
09 | Electrical cable wiring work | |
10 | Wall tiles work | |
11 | Common sanitary & Plumbing line work | |
12 | Outside plastering work | |
13 | Floor tiles/Marble work | |
14 | L.C.C work | |
15 | Grill & Railing work | |
16 | Inside paint & Polishing work | |
17 | Switch -Socket fitting work | |
18 | Outside paint work | |
19 | Door shutter work | |
20 | Aluminum/Glazing work | |
21 | Tiles Pointing work & Marble finishing work | |
22 | Commode – Basin fitting work and C.P fittings work |
|
23 | Lift/Generator /Substation /Solar work | |
24 | Boundary wall /Ground floor development work | |
25 | Roof top finishing work | |
26 | Roof top Gardening work |