Amabilia

Mohakhali, Dhaka

Completion Date

April 2026

Status Updated

March, 2024

SL. No Name of the work Progress details
01 Shore pile 100% completed
  Tie beam 100% completed
02 Earth cutting 100% Completed
03 Foundation Casting 100% Completed
03A Sub-Structure Work 50% Completed (Basement Column, R/W casting going on)
04 Supper structure  
05 Electrical conducting work  

 

06 Door frame fitting work  
07 Sanitary & plumbing line work (Ace drain water line, ver- vertical line)  
08 In side Plastering work  
09 Electrical cable wiring work  
10 Wall tiles work  
11 Common sanitary & Plumbing line work  
12 Outside plastering work  
13 Floor tiles/Marble work  
14 L.C.C work  
15 Grill & Railing work  
16 Inside paint & Polishing work  
17 Switch -Socket fitting work  
18 Outside paint work  
19 Door shutter work  
20 Aluminum/Glazing work  
21 Tiles Pointing work & Marble finishing work  
22 Commode – Basin fitting work and C.P fittings work  

 

23 Lift/Generator /Substation /Solar work  
24 Boundary wall /Ground floor development work  
25 Roof top finishing work  
26 Roof top Gardening work  