Beverly Residence

Gulshan, Dhaka
Expected Completion Date March 2027
Status Updated April, 2026
Back to all projects
Beverly Residence

Construction progress details

The progress table comes directly from the WordPress post content.

SL. No Name of the work Progress details
01 Foundation work 100 %
02 Super Structure work 95%
03 Block Work 90%
04 Electrical conducting work 60 %
05 Door frame fitting work 60%
06 Sanitary & plumbing line work 20%
07 In side Plastering work 50%
08 Electrical cable wiring work N/A
09 Wall tiles& floor tiles work N/A

 

10 Common sanitary & Plumbing line work N/A
11 Outside plastering work 60%
12 Floor tiles/Marble work N/A
13 L.C.C work N/A
14 Grill & Railing work N/A
15 Inside paint & Polishing work N/A
16 Switch -Socket fitting work  N/A
17 Outside paint work N/A
18 Door shutter work N/A
19 Aluminum/Glazing work N/A
20 Tiles Pointing work & Marble finishing work N/A
21 Commode – Basin fitting work and C.P fittings work N/A
22 Lift/Generator /Substation /Solar work N/A
23 Boundary wall /Ground floor development work N/A
24 Roof top finishing work N/A
25 Roof top Gardening work N/A
26 Gardening work 40%
27 Fair face finishing N/A
28 Artificial fair face N/A
29 Kitchen ver. Railing N/A
30 Outside AC lover N/A
31 Fir work N/A
32 Swimming pool works N/A
32 Pavement tiles N/A
33 Pvc false ceiling works N/A