City Pointe

Aftabnagar, Dhaka

Expected Completion Date

February 2027

Status Updated

January, 2025

SL. No Name of the work Progress details Remarks
01 Foundation work 100%  
02 Super Structure work: – a) Ground floor 100% completed, 1st floor 100% completed. 2nd 100% Completed, 3rd floor 100% complete, 4th floor 100% complete. 5th floor 25% complete. 5th floor Column work is on process  
03 Block Work    
04 Electrical conduiting work 23%  
05 Door frame fitting work    
06 Sanitary & plumbing line work    
07 In side Plastering work (Ceiling) 10%  
08 Electrical cable wiring work    
09 Wall tiles work    
10 Common sanitary & Plumbing line work    
11 Outside plastering work    
12 Floor tiles/Marble work    
13 L.C.C work    
14 Grill & Railing work    
15 Inside paint & Polishing work    
16 Switch -Socket fitting work    
17 Outside paint work    
18 Door shutter work    
19 Aluminum work    
20 Tiles Pointing work & Marble finishing work    
21 Commode – Basin fitting work and C.P fittings work    
22 Lift/Generator /Substation /Solar work    
23 Boundary wall /Ground floor development work    
24 Roof top finishing work    
25 Roof top Gardening work G.F Garden work    