bti Celebration Point

Plot: 3 & 5, Road: 113/A, Gulshan-2, Dhaka-1212

Crown Manor

Expected Completion Date February 2029
Status Updated April, 2026
Back to all projects
Crown Manor

Construction progress details

The progress table comes directly from the WordPress post content.

SL. No Name of the work Location Progress details Remarks
01 Foundation work 100% completed
02 Super Structure work Gr. Floor Roof Casting Completed
03 Block Work
04 Electrical conduiting work
05 Door frame fitting work
06 Sanitary & plumbing line work
07 In side Plastering work
08 Electrical cable wiring work
09 Wall tiles work
10 Common sanitary & Plumbing line work
11 Outside plastering work
12 Floor tiles/Marble work
13 L.C.C work
14 Grill & Railing work
15 Inside paint & Polishing work
16 Switch -Socket fitting work
17 Outside paint work
18 Door shutter work
19 Aluminum work
20 Tiles Pointing work & Marble finishing work
21 Commode-Basin fitting work and CP fittings work
22 Lift/Generator /Substation /Solar work
23 Boundary wall /Ground floor development work
24 Roof top finishing work
25 Roof top Gardening work G.F Garden work