Gold Star

Bashundhara, Dhaka

Completion Date

November 2024

Status Updated

November, 2022

SL. No Name of the work Progress details
01 Foundation work Pile cap Completed.
02 Super Structure work G. Floor Column casting completed. G.Floor roof slab work completed. Ground floor roof slab work completed.1st floor roof slab work on going.
03 Block Work  
04 Electrical Conduit work  
05 Door frame fitting work  
06 Sanitary & plumbing line work  
07 In side Plastering work  
08 Electrical cable wiring work  
09 Wall tiles  work  
10 Common sanitary & Plumbing line work  
11 Outside plastering work  
12 Floor tiles/Marble work  
13 L.C.C work  
14 Grill & Railing work  
15 Inside paint & Polishing work  
16 Switch -Socket fitting work  
17 Outside paint work  
18 Door shutter work  
19 Aluminum/Glazing work  
20 Tiles Pointing work & Marble finishing work  
21 Commode – Basin fitting work and C.P fittings work  
22 Lift/Generator /Substation /Solar work  
23 Boundary wall /Ground floor development work  
24 Roof top finishing work  
25 Roof top Gardening work  