Jolie

Block A, Bashundhara R/A

Expected Completion Date

October 2027

Status Updated

July, 2025

SL. No Name of the work Progress details
1 Pile Work 100% Complete
2 Super Structure work  
3 Block work  
4 Electrical  conduit work  
5 Door frame fitting work  
6 Sanitary & plumbing line  work  
7 In side Plastering work  
8 Electrical cable wiring work  
9 Wall tiles  work  
10 Common sanitary & Plumbing line work  
11 Outside plastering work  
12 Floor tiles/Marble work  
13 L.C.C work  
14 Grill & Railing work  
15 Inside paint & Polishing work  
16 Switch -Socket fitting work  
17 Outside paint work  
18 Door shutter work  
19 Aluminum/Glazing work  
20 Tiles Pointing work & Marble finishing work  
21 Commode – Basin fitting work and C.P fittings work  
22 Lift/Generator /Substation /Solar work  
23 Boundary wall /Ground floor development work  
24 Roof top finishing work  
25 Roof top Gardening work  