Plot: 3 & 5, Road: 113/A, Gulshan-2, Dhaka-1212

Jolie

Bashundhara R/A, Dhaka
Expected Completion Date March 2028
Status Updated April, 2026
Back to all projects
Jolie

Construction progress details

The progress table comes directly from the WordPress post content.

SL. No Name of the work Progress details Remarks
1 Foundation Work  Completed  
2 Super Structure work 4th floor Column Casting on process  
3 Block work    
4 Electrical  conduit work    
5 Door frame fitting work    
6 Sanitary & plumbing line  work    
7 In side Plastering work    
8 Electrical cable wiring work    
9 Wall tiles  work    
10 Common sanitary & Plumbing line work    
11 Outside plastering work    
12 Floor tiles/Marble work    
13 L.C.C work    
14 Grill & Railing work    
15 Inside paint & Polishing work    
16 Switch -Socket fitting work    
17 Outside paint work    
18 Door shutter work    
19 Aluminum/Glazing work    
20 Tiles Pointing work & Marble finishing work    
21 Commode – Basin fitting work and C.P fittings work    
22 Lift/Generator /Substation /Solar work    
23 Boundary wall /Ground floor development work    
24 Roof top finishing work    
25 Roof top Gardening work    

 