Expected Completion Date
March 2025
Status Updated
November, 2024
SL. No | Name of the work | Progress details |
Foundation work | 100% Completed | |
Super Structure work | 97% completed | |
Block work | A-1=100%, A-2=100%, A-3=100%, A-4=100%, A-5=100%, A-6=100%, A-7=100% | |
Electrical conduit work | A-1=100%, A-2=100%, A-3=100%, A-4=100% A-5=100%, A-6=100%, A-7=100% | |
Door frame fitting work | A-1=100%, A-2=100%, A-3=100%, A-4=100% A-5=100%, A-6=100%, A-7=100% | |
Sanitary & plumbing line work | A-1=45%, A-2=45%, A-3=45%, A-4=45% A-5=45%, A-6=45%, A-7=45% | |
In side Plastering work | A-1=100%, A-2=100%, A-3=100%, A-4=100% A-5=100%, A-6=100%, A- 7=100% | |
Electrical cable wiring work | 80% | |
Wall tiles work | 70% | |
Common sanitary & Plumbing line work | N/A | |
Outside plastering work | 95% | |
Floor tiles/Marble work | 75% | |
L.C.C work | N/A | |
Grill & Railing work | 80% | |
Inside paint & Polishing work | N/A | |
Switch -Socket fitting work | N/A | |
Outside paint work | N/A | |
Door shutter work | N/A | |
Aluminum/Glazing work | N/A | |
Tiles Pointing work & Marble finishing work | N/A | |
Commode – Basin fitting work and C.P fittings work | N/A | |
Lift/Generator /Substation /Solar work | 70% | |
Boundary wall /Ground floor development work | 70% | |
Roof top finishing work | 75% | |
Roof top Gardening work | 30% |