Moondrift Manor

North Khulshi, Chattogram

Completion Date

August 2026

Status Updated

September, 2024

SL. No Name of the work Progress details( Sep-24) Remarks
01 Pile work 100% completed.  
02 Foundation work 100% completed.  
03 Gr. Floor roof slab & beam Shuttering work is on process  
04 Brick Work    
05 Electrical work (Slab Conduit)    
06 Door frame fitting work    
07 Sanitary & plumbing line  work    
08 In side Plastering work    
09 Electrical cable wiring work    
09 Wall tiles  work    
10 Common sanitary & Plumbing line work    
11 Outside plastering work    
12 Floor tiles/Marble work    
13 L.C.C work    
14 Grill & Railing work    
15 Inside paint & Polishing work    
16 Switch -Socket fitting work    
17 Outside paint work    
18 Door shutter work    
19 Aluminum/Glazing work    
20 Tiles Pointing work & Marble finishing work    
21 Commode – Basin fitting work and C.P fittings work    
22 Lift/Generator /Substation /Solar work    
23 Boundary wall /Ground floor development work    
24 Land escape /Logo work    
25 Roof top finishing work    
26 Roof top Gardening work    
       