Moondrift Manor

North Khulshi, Chattogram

Completion Date

August 2026

Status Updated

March, 2024

SL. No Name of the work Progress details
01 Foundation work (Pile Work) Piling Work is ongoing.
02 Super Structure work
03 Brick Work
04 Electrical work (Slab Conduit)
05 Door frame fitting work
06 Sanitary & plumbing line  work
07 In side Plastering work
08 Electrical cable wiring work
09 Wall tiles  work
10 Common sanitary & Plumbing line work
11 Outside plastering work
12 Floor tiles/Marble work
13 L.C.C work
14 Grill & Railing work
15 Inside paint & Polishing work
16 Switch -Socket fitting work
17 Outside paint work
18 Door shutter work
19 Aluminum/Glazing work
20 Tiles Pointing work & Marble finishing work
21 Commode – Basin fitting work and C.P fittings work
22 Lift/Generator /Substation /Solar work
23 Boundary wall /Ground floor development work
24 Land escape /Logo work
25 Roof top finishing work
26 Roof top Gardening work