The Peak

ECB Circle, Dhaka
Expected Completion Date August 2027
Status Updated April, 2026
Back to all projects
The Peak

Construction progress details

The progress table comes directly from the WordPress post content.

SL. No Name of the work Progress details
  Foundation work 100% Completed
  Super Structure work 90% Completed
  Block work 30%
  Electrical conduit work 50% Completed
  Door frame fitting work 10%
  Sanitary & plumbing line work 05%
  In side Plastering work 28% Complete
  Electrical cable wiring work 05% Complete
  Wall tiles work N/A
  Common sanitary & Plumbing line work N/A
  Outside plastering work N/A
  Floor tiles/Marble work N/A
  L.C.C work N/A
  Grill & Railing work N/A
  Inside paint & Polishing work N/A
  Switch -Socket fitting work N/A
  Outside paint work N/A
  Door shutter work N/A
  Aluminum/Glazing work N/A
  Tiles Pointing work & Marble finishing work N/A
  Commode – Basin fitting work and C.P fittings work N/A
  Lift/Generator /Substation /Solar work N/A
  Boundary wall /Ground floor development work N/A
  Roof top finishing work N/A
  Roof top Gardening work N/A

 