The Retreat

Bashundhara R/A, Dhaka

Completion Date

November 2024

Status Updated

March, 2024

SL. No Name of the work Progress details
  Foundation work 100% Completed
  Super Structure work 97% completed
  Block work 95% Complete
  Electrical  conduit work  80% Complete
  Door frame fitting work 92% Complete
  Sanitary & plumbing line  work 78%  Complete
  In side Plastering work 90% Complete
  Electrical cable wiring work 50% Complete
  Wall tiles  work 65% Complete
  Common sanitary & Plumbing line work 30% Complete
  Outside plastering work 50% Complete
  Floor tiles/Marble work 40% Complete
  L.C.C work 15% Complete
  Grill & Railing work 30 % Complete
  Inside paint & Polishing work N/A
  Switch -Socket fitting work N/A
  Outside paint work N/A
  Door shutter work N/A
  Aluminum/Glazing work N/A
  Tiles Pointing work & Marble finishing work N/A
  Commode – Basin fitting work and C.P fittings work N/A
  Lift/Generator /Substation /Solar work N/A
  Boundary wall /Ground floor development work N/A
  Roof top finishing work N/A
  Roof top Gardening work N/A