Dreams Ville

Bashundhara R/A, Dhaka

Completion Date

September 2024

Status Updated

March, 2024

SL. No Name of the work Progress details
01 Foundation work 100% completed.
02 Super Structure work 100% completed.
03 Block Work A-1 = 100%, A-2= 100%, A-3= 100%, A-4= 100%, A-5= 100%, A-6= 100%, A-7= 100%, A-8= 100%, A-9= 100%,
04 Electrical conducting work A-1 = 100%, A-2= 100%, A-3= 100%, A-4= 100%, A-5=100%, A-6= 100%, A-7= 100%, A-8= 100%, A-9= 100%,
05 Door frame fitting work A1= 100%, A-2= 100%, A-3= 100%, A-4= 100%, A-5= 100%, A-6= 100%, A-7= 100%, A-7= 100%, A-7= 100%,
06 Sanitary & plumbing line work  A-2= 60%, A-3= 60%, A-4= 60%, A-5= 60%, A-6= 60%, A-7= 60%, A-8= 60%, A-9= 60%,
07 In side Plastering work  A-1 = 100%, A-2= 100%, A-3= 100%, A-4= 100%, A-5= 100%, A-6= 100%, A-7= 100%, A8= 100%, A-9= 100%,
08 Electrical cable wiring work A-4 =50%
09 Wall tiles work A-2= 25%, A-3= 30%, A-4= 25%, A-5= 30%, A-6= 30%, A-7= 20%,
10 Common sanitary & Plumbing line work N/A
11 Outside plastering work 60%
12 Floor tiles/Marble work N/A
13 L.C.C work N/A
14 Grill & Railing work N/A
15 Inside paint & Polishing work N/A
16 Switch -Socket fitting work N/A
17 Outside paint work N/A
18 Door shutter work N/A
19 Aluminum work N/A
20 Tiles Pointing work & Marble finishing work N/A
21 Commode – Basin fitting work and C.P fittings work N/A
22 Lift/Generator /Substation /Solar work N/A
23 Boundary wall /Ground floor development work N/A
24 Roof top finishing work 70%
25 Roof top Gardening work G.F Garden work N/A