The Boulevard

Bashundhara, Dhaka

Completion Date

January 2025

Status Updated

January, 2023

SL. No Name of the work Progress details
01 Foundation work Footing work ongoing.
02 Super Structure work  
03 Block Work  
04 Electrical conduting work  
05 Door frame fitting work  
06 Sanitary & plumbing line  work  
07 In side Plastering work  
08 Electrical cable wiring work  
09 Wall tiles  work  
10 Common sanitary & Plumbing line work  
11 Outside plastering work  
12 Floor tiles/Marble work  
13 L.C.C work  
14 Grill & Railing work  
15 Inside paint & Polishing work  
16 Switch -Socket fitting work  
17 Outside paint work  
18 Door shutter work  
19 Aluminum work  
20 Tiles Pointing work & Marble finishing work  
21 Commode – Basin fitting work and C.P fittings work  
22 Lift/Generator /Substation /Solar work  
23 Boundary wall /Ground floor development work  
24 Roof top finishing work  
25 Roof top Gardening work G.F Garden work  