The Santorini

Bashundhara, Dhaka

Completion Date

April 2025

Status Updated

February, 2023

SL. No Name of the work Progress details
  Foundation work 100% Completed
  Super Structure work  
  v  Ground Floor 90%
  v  1st Floor 25%
  v  2nd Floor N/A
  v  3rd Floor N/A
  v  4th Floor  
  v  5rd Floor  
  v  6rd Floor  
  Block work  
  v  1st Floor  
  v  2nd Floor  
  v  3rd Floor  
  Electrical  conduiting work N/A
  Door frame fitting work N/A
  Sanitary & plumbing line  work N/A
  In side Plastering work N/A
  Electrical cable wiring work N/A
  Wall tiles  work N/A
  Common sanitary & Plumbing line work N/A
  Outside plastering work N/A
  Floor tiles/Marble work N/A
  L.C.C work N/A
  Grill & Railing work N/A
  Inside paint & Polishing work N/A
  Switch -Socket fitting work N/A
  Outside paint work N/A
  Door shutter work N/A
  Aluminum/Glazing work N/A
  Tiles Pointing work & Marble finishing work N/A
  Commode – Basin fitting work and C.P fittings work N/A
  Lift/Generator /Substation /Solar work N/A
  Boundary wall /Ground floor development work 30%
  Roof top finishing work N/A
  Roof top Gardening work N/A